封面
版权信息
Announcement of Ministry of the Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms
3 Basic Requirement
4 Power Transformers and Oil Immersed Type Reactors
- APP免费
4.1 Loading,Transportation and Erection
- APP免费
4.2 Handover and Keeping
- APP免费
4.3 Treatment of Insulation Oil
- APP免费
4.4 Nitrogen Drain
- APP免费
4.5 Body Inspection
- APP免费
4.6 Inside Installation and Connection
- APP免费
4.7 Desiccating
- APP免费
4.8 Installation of Transformer Body and Accessories
- APP免费
4.9 Oil Injection
- APP免费
4.10 Hot Oil Circulation
- APP免费
4.11 Charging Oil,Seal Checking and Resting
- APP免费
4.12 Acceptance of the Handover Project
- APP免费
5 Instrument Transformer
- APP免费
5.1 General Requirements
- APP免费
5.2 Body Inspection
- APP免费
5.3 Installation
- APP免费
5.4 Acceptance of the Handover Project
- APP免费
Appendix A Conditions of New Installed Power Transformers and Oil-immersed Type Reactors No Need Drying
- APP免费
Explanation of Wording in This Code
- APP免费
Normative Standard
更新时间:2020-09-25 15:24:13